Skip to content
PRIVATE-LABEL UNDERWEAR MANUFACTURINGFor brands & retailers Since 1986
DALIDALI UNDERWEAR
Contact

DALI UNDERWEAR / MANUFACTURING

More room for the next stage of manufacturing.

The new campus in the Phnom Penh Special Economic Zone has entered trial production. Construction and fit-out continue; the facility is not yet in full operation.

DALI’s new Cambodia campus exterior during phased development
New Cambodia campus / Trial production; construction continuing
01

A purpose-built expansion, introduced in phases.

The development includes a 36,000 m² site and 30,000 m² of building space. The plan brings garment and sock production into an additional campus, with space and supporting infrastructure planned together.

The additional campus is intended to support future production growth alongside the existing China and Cambodia network. For a proposed order, DALI confirms the available operation and its production schedule.

02

Expansion plans at a glance.

Solar generation, energy storage and the LABS programme are included in the development plan and have not been confirmed as commissioned.

ItemStatus
Campus operationsTrial production; construction and fit-out continuing
Garment production30 lines planned
Sock production1,000 knitting machines planned
Workforce2,000+ employees planned
Full operationQ1 2027 target
03

Plan supply around confirmed operations.

The existing China and Cambodia network remains the starting point for current programme discussions. Expansion targets are separate from the group’s current annual capacity figure.

When reviewing an ongoing collection or future scale-up, share the expected timing, quantities and product mix. The team can discuss the relevant production route and the status of any proposed campus allocation.

Workshop at DALI’s new Cambodia campus during trial production
New Cambodia campus workshop during trial production. Construction and fit-out continue; full operation has not yet been reached.

BUYER QUESTIONS

Before the next step.

Is the new campus already fully operational?

No. It is in trial production, with construction and supporting facilities continuing.

Does the planned campus add to the published current capacity?

Not as an achieved result. Current group capacity and future expansion targets remain separate.

CONTINUE THE BRIEF

Connected decisions.

Cambodia operationsPeople & environmentContact

YOUR NEXT COLLECTION

Bring your brief.
Let’s build the collection.

Share the styles, estimated garment quantities and destination market. Product references or an early range plan are welcome.

Discuss your collection